CERN
|
MS-4511 |
Design and supply of flexible cryostats for the High-Luminosity Project |
Market Survey |
Geneva |
2019-02-27 |
- |
Closed |
CERN
|
MS-4738 |
Supply of structural beams for the production of two welded steel structures for the construction of the warm structures of two cryostats for Deep Underground Neutrino Experiment (DUNE) |
Market Survey |
Geneva |
2022-01-21 |
- |
Closed |
CERN
|
MS-5069 |
Supply of Perforated Printed Circuit Boards to assemble 160 Charge Readout Planes for the DUNE Vertical Drift far detector module |
Market Survey |
Geneva |
2024-12-16 |
2025-01-01 |
Closed |
CERN
|
MS-4512 |
Supply of Multi-layer insulation (MLI) blankets for HL-LHC superconducting magnets |
Market Survey |
Geneva |
2019-05-06 |
- |
Closed |
CERN
|
MS-4512 |
Supply of Multi-layer insulation (MLI) blankets for HL-LHC superconducting magnets |
Market Survey |
Geneva |
2018-05-06 |
- |
Closed |
CERN
|
MS-4770 |
Supply of CO2 cooling plants and accumulators |
Market Survey |
Geneva |
2022-03-11 |
- |
Closed |
CERN
|
MS-4513 |
Design and supply of 76 units of 2kA Direct Current Current Transducers for the High-Luminosity Project |
Market Survey |
Geneva |
2018-05-02 |
- |
Closed |
CERN
|
DO-34596 |
Supply of mobile x-ray and tomography system for inspection of LHC |
Market Survey |
Geneva |
2025-01-10 |
1000-01-01 |
Closed |
CERN
|
DO-34601 |
Manufacture and supply of thyratron heater's power supplies of kickers systems |
Market Survey |
Geneva |
2025-01-24 |
1000-01-01 |
Closed |
CERN
|
MS-4514 |
Design and supply of 20 units of 14kA and 12 units of 18kA Direct Current Current Transducers for the High-Luminosity Project |
Market Survey |
Geneva |
2018-05-02 |
- |
Closed |
CERN
|
MS-5082 |
Provision of installation services of HV cable accessories for voltage levels between 3.3 kV and 66 kV |
Market Survey |
Geneva |
2025-02-06 |
1000-01-01 |
Closed |
CERN
|
MS-4727 |
Supply of Optical Fibre microducts and protected microducts. |
Market Survey |
Geneva |
2022-05-05 |
2000-01-01 |
Closed |
CERN
|
MS-4532 |
Supply and installation of X-ray diffractometer (XRD) |
Market Survey |
Geneva |
2018-05-20 |
- |
Closed |
CERN
|
MS-4781 |
Supply of an estimated quantity of 120 dry primary pumps. |
Market Survey |
Geneva |
2022-05-03 |
2022-06-27 |
Closed |
CERN
|
MS-4526 |
Supply of approximately 800 high-quality, radiation-tolerant 3D silicon pixel sensors for the Phase-2 upgrade of the CMS Inner Tracker |
Market Survey |
Geneva |
2018-05-27 |
- |
Closed |
CERN
|
MS-4749 |
Supply, installation, commissioning, and maintenance of low voltage indoor modular metal-enclosed 230/400V distribution switchboards compliant to IEC 61439. |
Market Survey |
Geneva |
2022-04-04 |
2022-06-27 |
Closed |
CERN
|
MS-4537 |
Supply of pre-fitted optical fibre cables and associated hardware |
Market Survey |
Geneva |
2018-05-17 |
- |
Closed |
CERN
|
DO-34660 |
Supply of 20 Bipolar High Power Impulse Magnetron Sputtering power supplies of 500W each |
Price Enquiry |
Geneva |
2025-03-05 |
1000-01-01 |
Closed |
CERN
|
MS-5089 |
Supply of Turnkey High-Power RF Systems |
Market Survey |
Geneva |
2025-03-12 |
1000-01-01 |
Closed |
CERN
|
DO-34652 |
Supply of a 5-axis CNC machine for the manufacturing of prototypes or small series for the accelerators |
Price Enquiry |
Geneva |
2025-02-28 |
1000-01-01 |
Closed |