CERN
|
MS-4941 |
Supply of vacuum connection tools to connect LHC collimators to flexible bellows |
Market Survey |
Geneva |
2023-10-24 |
1000-01-01 |
Closed |
CERN
|
MS-4668 |
Supply of an Appliance for Quantum Computing Simulation |
Market Survey |
Geneva |
2021-01-05 |
- |
Closed |
CERN
|
MS-4937 |
Supply and design of connectorized Multimode optical fibres trunk cables for ATLAS LAr and Tile calorimeters |
Market Survey |
Geneva |
2023-10-24 |
1000-01-01 |
Closed |
CERN
|
MS-4667 |
Supply of Engineering Support and Worksite Supervision for the construction of a new and extension of an existing air-insulated 66/18 kV electrical substation |
Market Survey |
Geneva |
2020-12-11 |
- |
Closed |
CERN
|
MS-4938 |
Framework Market Survey concerning the supply of a total of 20 manifolds (distribution cold boxes) of four types for the CMS PH2 CO2 cooling system |
Market Survey |
Geneva |
2023-10-16 |
1000-01-01 |
Closed |
CERN
|
MS-4309 |
Supply of Nb (Niobium) and NbTi (Niobium Titanium) for HL-LHC Crab Cavities |
Market Survey |
Geneva |
2016-03-02 |
- |
Closed |
CERN
|
MS-4436 |
Supply of helium leak detectors |
Market Survey |
Geneva |
2018-03-27 |
- |
Closed |
CERN
|
MS-4653 |
Framework Market Survey concerning the supply of Energy Extraction Systems for superconducting magnet circuits based on vacuum switches for the High Luminosity Project |
Market Survey |
Geneva |
2020-12-11 |
- |
Closed |
CERN
|
MS-4308 |
Supply of DQW Dressed Cavities |
Market Survey |
Geneva |
2016-03-02 |
- |
Closed |
CERN
|
MS-4149 |
Framework Market Survey concerning the supply of 36kV dry type power transformers |
Market Survey |
Geneva |
2016-02-07 |
- |
Closed |
CERN
|
MS-4295 |
Supply of aluminium raw material for the outer shells of new inner triplet magnets. |
Market Survey |
Geneva |
2016-01-17 |
- |
Closed |
CERN
|
MS-4449 |
Supply of a medium voltage Pulse Forming System.for CLIC |
Market Survey |
Geneva |
2018-05-31 |
- |
Closed |
CERN
|
MS-4297 |
Supply of raw material for MQXFB : ARMCO and Nitronic 50 |
Market Survey |
Geneva |
2016-01-17 |
- |
Closed |
CERN
|
MS-4296 |
Supply of supporting structures for the inner triplet quadrupole magnets MQXFB including the yoke, load pad and collar structure. |
Market Survey |
Geneva |
2016-01-17 |
- |
Closed |
CERN
|
MS-4461 |
Supply and installation of a modular ultrasonic immersion testing system |
Market Survey |
Geneva |
2018-05-29 |
- |
Closed |
CERN
|
MS-4935 |
Assembly and Test of DAQ ATCA Electronic Cards |
Market Survey |
Geneva |
2023-10-05 |
1000-01-01 |
Closed |
CERN
|
MS-4421 |
Supply of TiAl6V4 Rings and Springs for HL-LHC Shielded Beam Screens |
Market Survey |
Geneva |
2018-05-24 |
- |
Closed |
CERN
|
MS-4959 |
Supply of UPS from 20 to 200 kVA |
Market Survey |
Geneva |
2023-12-14 |
1000-01-01 |
Closed |
CERN
|
MS-4954 |
Supply of stainless steel rolled and forged round bars EN 1.4429 AISI 316LN for ultra-high vacuum applications |
Market Survey |
Geneva |
2023-12-01 |
1000-01-01 |
Closed |
CERN
|
MS-4637 |
Provision of post irradiation examination services of one beam dump |
Market Survey |
Geneva |
2020-09-01 |
- |
Closed |